FWD STBD MOORING WINCH (WINDLASS) OF MV LANTAU BREEZE HAS BEEN OVERHAULD IN HAIPHONG PORT ALONGSIDE ON 9TH NOVEMBER 2017 Xem thêm
OVERHAULED MAIN ENGINE B&W 7S70MC FOR CONTAINER VESSEL LADY OF LUCK Xem thêm
ALL OF LASHING WELDING SEAM HAVE BEEN TESTED BY BACVIET Xem thêm
INTERNAL COMPONENTS OF ALMOS CONDENSER OF MV SAKIZAYA BRAVE HAVE BEEN FABRICATED Xem thêm
FABRICATED AND RENEWED PS ACCOMODATION LADDER FOR MV KHARIS HERITAGE Xem thêm
TEMPORARY REPAIR FOR 02 CYLINDERHEADS OF MAIN ENGINE HAVE BEEN CARRIED OUT ON BOARD OF MV MAGNAVIA Xem thêm
WATER MIST SYSTEM OF MV YM INSTRUCTION HAVE BEEN REPAIRED ON DATE 2ND JAN 2016 Xem thêm
REPAIRED ELECTRIC CONTROL BOX FOR WINDLASS WHICH WERE BURNNED Xem thêm
Repair No 1 Crane sheave bearings at the end of the Jib were damaged Xem thêm
OUR COMPANY SUPPLIED ALL OF THE HOT DIP GALVANIZED GRATINGS IN HAI PHONG AND ANOTHER PLACES IN VIETNAM Xem thêm
Main Engine & aux engine Xem thêm
VESSEL M/V HAI SHUN JOB NAME: OUVERHAUL TURBO CHARGER VTR 401 PLACE: HAIPHONG PORT - VIETNAM Xem thêm
Crankshaft of Main engine had big damaged. Maximum deflection 4.2 mm Which have been bended in workshop After bended, the crankshaft is in satisfaction Xem thêm
DIVING INSPECTION AND CLEANING THE SHIP HULL UNDER WATER OF VESSEL MT.SENNA2 HAS BEEN CARRIED OUT AT INNER ANCHORAGE OF HAIPHONG PORT-VIETNAM Xem thêm
MAIN ENGINE HANSHIN LH41-LA HAS BEEN REPAIRED IN HAIPHONG. ALL REPAIRING ITEMS AS FOLLOW INQUIRY OF SHIP AND SHIPOWNER HAVE CARRIED OUT BY BACVIET COMMERCIAL AND SHIPTECH JSC Xem thêm
PROJECTS UPDATE
VIDEO